Fabric of the Land
Join us for Fabric of the Land, a film screening and Q+A with designer Ella Doran and filmmaker Paul Wyatt.
In celebration of Wool Month 2024, we are hosting a screening of Fabric of Land, a short film about an innovative project by designer Ella Doran and filmed by documentary filmmaker Paul Wyatt.
The film takes on Doran's most ambitious project to date: creating sustainable products using wool from sheep that graze on the 500 acres of historic Yorkshire Sculpture Park. Fabric of the Land highlights the importance of the circular economy in reducing waste and sustaining livelihoods and traditions.
Following the 15-minute screening, a Q&A session will be chaired by Ewa Socha, our Head of Commercial Development, where Doran and Wyatt will discuss climate action and design. Refreshments will be available at the bar throughout the event.
About the artists
Ella Doran
Ella Doran has been a part of the vibrant creative community in hackney for over 20 years, she regularly runs participatory projects, educating citizens about the principles of the circular economy, through live reuse and repair demonstrations and workshops.
Doran's solo show and documentary on material circularity and transparency, 'Sheep to Seat, Fleece to Floor, was held at Yorkshire Sculpture Park in the summer of 2019. Over her career, she has collaborated with leading brands and institutions such as Paloma Picasso, Tate, The Royal Society of Arts, The V&A, Habitat, John Lewis, Portmeirion, Twentytwentyone, SCP, Camira, and The V&A.
Find out more about Ella Doran here.
Paul Wyatt
Paul Wyatt is a filmmaker and producer with a background in creative direction. His work spans short and long-form films, focusing on impactful storytelling across, culture, and society. He has collaborated with renowned institutions such as The Design Museum, the Royal College of Art, and the World Wide Fund for Nature.
Wyatt's experience includes teaching at MetFilm School and working with University of the Arts London. He has also judged the RSA Student Design Awards and contributes regularly to the creative press.
Find out more about Paul Wyatt here.
Date
Sunday 20 October 2024
Time
2pm to 3.30pm
Cost
Free (with options to donate)
Location
Museum of the Home - 136 Kingsland Road, London E2 8EA